Triple

T3420610
Position Surface form Disambiguated ID Type / Status
Subject Dev channel E72106 entity
Predicate instanceOf P0 FINISHED
Object Google Chrome release channel C4491 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Google Chrome release channel
Context triple: [Dev channel, instanceOf, Google Chrome release channel]
  • A. Google Chrome edition chosen
    Google Chrome edition is a conceptual class representing a specific variant or release configuration of the Google Chrome web browser, distinguished by features, platform, or distribution channel.
  • B. OSS branch
    An OSS branch is a parallel line of development in an open-source software repository where changes can be made, tested, and reviewed independently before being merged into the main codebase.
  • C. experimental web browser
    An experimental web browser is a software application designed to explore and test novel web technologies, interfaces, and browsing paradigms that extend or challenge conventional browser behavior.
  • D. operating system version
    An operating system version is a specific release of an operating system, identified by a unique number or name, that encapsulates a defined set of features, updates, and compatibility characteristics.
  • E. channel
    A channel is a conduit or medium through which information, materials, or resources are transmitted from one point or entity to another.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ad85ad38e48190b7660c5118a35289 completed March 8, 2026, 2:20 p.m.
Created at: March 8, 2026, 3:15 p.m.