Triple

T3418209
Position Surface form Disambiguated ID Type / Status
Subject Apache Maven E72060 entity
Predicate buildPhase P22825 FINISHED
Object validate LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: validate | Statement: [Apache Maven, buildPhase, validate]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: buildPhase
Context triple: [Apache Maven, buildPhase, validate]
  • A. constructionPhase
    Indicates the specific stage or period an entity is in within an overall construction or building process.
  • B. builtInPhases
    Indicates that something is constructed, developed, or implemented in distinct, sequential stages or phases.
  • C. programPhase chosen
    Indicates the specific stage or phase within a broader program or process that an entity is currently associated with.
  • D. builder
    Indicates that an entity is responsible for constructing, creating, or assembling another entity.
  • E. upgradePhase
    Indicates the stage or step within a process where an entity is being upgraded or transitioned to a more advanced version or state.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ad85ad38e48190b7660c5118a35289 completed March 8, 2026, 2:20 p.m.
NER Named-entity recognition batch_69adb92df1e48190bbf22a47e44579f1 completed March 8, 2026, 6 p.m.
PD Predicate disambiguation batch_69adadfcbc38819080852c18240451c5 completed March 8, 2026, 5:12 p.m.
Created at: March 8, 2026, 3:15 p.m.