Triple
T34168110
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Hafenfest Marina Rünthe |
E876468
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | harbor festival |
C31416
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: harbor festival Context triple: [Hafenfest Marina Rünthe, instanceOf, harbor festival]
-
A.
May Day festival
A May Day festival is a springtime celebration featuring traditional dances, music, and rituals that honor renewal, fertility, and community.
-
B.
waterfront festival
chosen
A waterfront festival is a public celebration held along a body of water that features entertainment, food, cultural activities, and recreational events that highlight the unique character of the waterside location.
-
C.
float festival
A float festival is a celebratory event featuring elaborately decorated, often themed vehicles or platforms that parade through streets or waterways, accompanied by music, performances, and community festivities.
-
D.
harbor
A harbor is a sheltered body of water, often equipped with docks and facilities, where ships can anchor safely for loading, unloading, and protection from rough seas.
-
E.
festival
A festival is a planned, often recurring event where a community gathers to celebrate cultural, religious, seasonal, or thematic traditions through shared activities, performances, and rituals.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f349ad97ac8190bf1f17417c970e64 |
completed | April 30, 2026, 12:23 p.m. |
Created at: May 1, 2026, 1:54 a.m.