Triple
T3415226
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Amazon Corretto |
E71992
|
entity |
| Predicate | isProductionReady |
P49321
|
FINISHED |
| Object | true |
—
|
LITERAL FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: true | Statement: [Amazon Corretto, isProductionReady, true]
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: isProductionReady Context triple: [Amazon Corretto, isProductionReady, true]
-
A.
hasProduction
Indicates that an entity is associated with, or responsible for, the creation or manufacture of another entity or product.
-
B.
isPro
Indicates that an entity is a professional or expert in a particular field, activity, or domain.
-
C.
hasProductionFormat
Indicates that an entity is associated with, or presented in, a particular production or media format.
-
D.
hasStageProduction
Indicates that one entity is realized, adapted, or presented as a stage production (such as a play, musical, or theatrical performance) associated with another entity.
-
E.
isComplete
Indicates that an action, process, or object has finished all required steps or reached its final state with nothing remaining to be done.
- F. None of above. chosen
Provenance (4 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ad85ad38e48190b7660c5118a35289 |
completed | March 8, 2026, 2:20 p.m. |
| NER | Named-entity recognition | batch_69adb929b8ec8190aef431ec8ea2cf80 |
completed | March 8, 2026, 6 p.m. |
| PD | Predicate disambiguation | batch_69adadfcbc38819080852c18240451c5 |
completed | March 8, 2026, 5:12 p.m. |
| PDg | Predicate description generation | batch_69adb23d23088190aeafe1379eae2eaa |
completed | March 8, 2026, 5:30 p.m. |
Created at: March 8, 2026, 3:15 p.m.