Triple
T34096840
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Georgia Power hydroelectric dam at Lake Sinclair |
E874451
|
entity |
| Predicate | associatedWith |
P37
|
FINISHED |
| Object | Georgia Power hydroelectric system |
—
|
NE NERFINISHED |
Named-entity recognition
Before disambiguation, gpt-5-mini classified whether the object phrase is a named entity — the step behind the object's NE type shown above.
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Georgia Power hydroelectric system | Statement: [Georgia Power hydroelectric dam at Lake Sinclair, associatedWith, Georgia Power hydroelectric system]
Provenance (2 batches)
| Stage | Batch ID | Job type | Status |
|---|---|---|---|
| creating | batch_69f349a735208190a1dbfb1c2a121059 |
elicitation | completed |
| NER | batch_69f70c5d397c8190a662b6137058c075 |
ner | completed |
Created at: May 1, 2026, 1:53 a.m.