Triple

T34096836
Position Surface form Disambiguated ID Type / Status
Subject Georgia Power hydroelectric dam at Lake Sinclair E874451 entity
Predicate purpose P79 FINISHED
Object support regional electricity demand LITERAL FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: support regional electricity demand | Statement: [Georgia Power hydroelectric dam at Lake Sinclair, purpose, support regional electricity demand]

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f349a735208190a1dbfb1c2a121059 completed April 30, 2026, 12:23 p.m.
NER Named-entity recognition batch_69f70c5d397c8190a662b6137058c075 completed May 3, 2026, 8:50 a.m.
Created at: May 1, 2026, 1:53 a.m.