Triple

T34096825
Position Surface form Disambiguated ID Type / Status
Subject Georgia Power hydroelectric dam at Lake Sinclair E874451 entity
Predicate uses P98 FINISHED
Object water flow LITERAL FINISHED

Named-entity recognition

Before disambiguation, gpt-5-mini classified whether the object phrase is a named entity — the step behind the object's LITERAL type shown above.

Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: water flow | Statement: [Georgia Power hydroelectric dam at Lake Sinclair, uses, water flow]

Provenance (2 batches)

Stage Batch ID Job type Status
creating batch_69f349a735208190a1dbfb1c2a121059 elicitation completed
NER batch_69f70c5d397c8190a662b6137058c075 ner completed
Created at: May 1, 2026, 1:53 a.m.