Triple
T34095450
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Geoterm JSC |
E874413
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | geothermal power company |
C47333
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: geothermal power company Context triple: [Geoterm JSC, instanceOf, geothermal power company]
-
A.
wind power company
A wind power company is an organization that develops, owns, and operates wind energy projects to generate and sell electricity produced from wind turbines.
-
B.
energy solutions company
An energy solutions company designs, develops, and delivers technologies and services that provide efficient, reliable, and sustainable energy to residential, commercial, and industrial customers.
-
C.
geothermal area
A geothermal area is a region where heat from the Earth's interior reaches the surface, often producing hot springs, geysers, fumaroles, and other thermal features.
-
D.
public utility company
A public utility company is an organization, often government-regulated, that provides essential services such as electricity, water, gas, or telecommunications to the public, typically operating as a natural monopoly to ensure reliable and widespread access.
-
E.
independent energy company
chosen
An independent energy company is a non-vertically integrated firm that explores for, produces, and/or markets energy resources—such as oil, gas, or renewables—without being part of a major integrated utility or oil conglomerate.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f349a735208190a1dbfb1c2a121059 |
completed | April 30, 2026, 12:23 p.m. |
Created at: May 1, 2026, 1:52 a.m.