Triple

T34095450
Position Surface form Disambiguated ID Type / Status
Subject Geoterm JSC E874413 entity
Predicate instanceOf P0 FINISHED
Object geothermal power company C47333 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: geothermal power company
Context triple: [Geoterm JSC, instanceOf, geothermal power company]
  • A. wind power company
    A wind power company is an organization that develops, owns, and operates wind energy projects to generate and sell electricity produced from wind turbines.
  • B. energy solutions company
    An energy solutions company designs, develops, and delivers technologies and services that provide efficient, reliable, and sustainable energy to residential, commercial, and industrial customers.
  • C. geothermal area
    A geothermal area is a region where heat from the Earth's interior reaches the surface, often producing hot springs, geysers, fumaroles, and other thermal features.
  • D. public utility company
    A public utility company is an organization, often government-regulated, that provides essential services such as electricity, water, gas, or telecommunications to the public, typically operating as a natural monopoly to ensure reliable and widespread access.
  • E. independent energy company chosen
    An independent energy company is a non-vertically integrated firm that explores for, produces, and/or markets energy resources—such as oil, gas, or renewables—without being part of a major integrated utility or oil conglomerate.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f349a735208190a1dbfb1c2a121059 completed April 30, 2026, 12:23 p.m.
Created at: May 1, 2026, 1:52 a.m.