Triple

T3407226
Position Surface form Disambiguated ID Type / Status
Subject François Zola E71802 entity
Predicate designed P184 FINISHED
Object Zola Dam E374596 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Zola Dam | Statement: [François Zola, designed, Zola Dam]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Zola Dam
Context triple: [François Zola, designed, Zola Dam]
  • A. Zola Dam chosen
    Zola Dam is a 19th-century hydraulic engineering project in Aix-en-Provence, France, designed by engineer François Zola and notable as an early example of modern dam construction.
  • B. Vaal Dam
    Vaal Dam is a major reservoir in South Africa that supplies water to the Gauteng region and plays a key role in the country’s water management and power generation systems.
  • C. Wyangala Dam
    Wyangala Dam is a major water storage and flood mitigation reservoir in New South Wales, Australia, serving irrigation, water supply, and recreational purposes.
  • D. Roseires Dam
    Roseires Dam is a major hydroelectric and irrigation dam on the Blue Nile in Sudan, crucial for water storage, power generation, and flood control in the region.
  • E. Gariep Dam
    Gariep Dam is South Africa’s largest storage reservoir, situated on the Orange River and serving as a key source of water, hydroelectric power, and recreation for the surrounding regions.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ad85ac312481909e7027ced1456a9f completed March 8, 2026, 2:20 p.m.
NER Named-entity recognition batch_69adb8ede9c48190b13b0f5e7474e7fa completed March 8, 2026, 5:59 p.m.
NED1 Entity disambiguation (via context triple) batch_69b4881cd6f081908981db17758146f7 completed March 13, 2026, 9:56 p.m.
Created at: March 8, 2026, 3:15 p.m.