Triple

T3407005
Position Surface form Disambiguated ID Type / Status
Subject Notwane River E71797 entity
Predicate hasPart P35 FINISHED
Object Gaborone Dam E263084 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Gaborone Dam | Statement: [Notwane River, hasPart, Gaborone Dam]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Gaborone Dam
Context triple: [Notwane River, hasPart, Gaborone Dam]
  • A. Gaborone Dam chosen
    Gaborone Dam is a major reservoir near Gaborone, Botswana, serving as a key water supply source and popular recreation area for the region.
  • B. Kafue Gorge Dam
    Kafue Gorge Dam is a major hydroelectric power facility on the Kafue River in Zambia, providing a significant portion of the country’s electricity supply.
  • C. Vaal Dam
    Vaal Dam is a major reservoir in South Africa that supplies water to the Gauteng region and plays a key role in the country’s water management and power generation systems.
  • D. Hartbeespoort Dam
    Hartbeespoort Dam is a large, popular recreational and irrigation reservoir in South Africa’s North West Province, known for its scenic setting and proximity to Pretoria and Johannesburg.
  • E. Gariep Dam
    Gariep Dam is South Africa’s largest storage reservoir, situated on the Orange River and serving as a key source of water, hydroelectric power, and recreation for the surrounding regions.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ad85ac312481909e7027ced1456a9f completed March 8, 2026, 2:20 p.m.
NER Named-entity recognition batch_69adb8ede9c48190b13b0f5e7474e7fa completed March 8, 2026, 5:59 p.m.
NED1 Entity disambiguation (via context triple) batch_69b432f118f48190a81795289a20efe5 completed March 13, 2026, 3:53 p.m.
Created at: March 8, 2026, 3:15 p.m.