Triple

T34036534
Position Surface form Disambiguated ID Type / Status
Subject Keihan network between Osaka and Kyoto E872813 entity
Predicate instanceOf P0 FINISHED
Object intercity rail system C75 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: intercity rail system
Context triple: [Keihan network between Osaka and Kyoto, instanceOf, intercity rail system]
  • A. intercity passenger rail project
    An intercity passenger rail project is a coordinated planning, design, and construction effort to develop or improve rail infrastructure and services that transport people efficiently between cities over medium to long distances.
  • B. rapid rail system
    A rapid rail system is a high-speed, high-capacity railway network designed to transport large numbers of passengers quickly and efficiently between urban or regional destinations using dedicated tracks and frequent service.
  • C. passenger rail service chosen
    Passenger rail service is a transportation system that operates trains to carry people between locations on a scheduled basis, typically offering various classes of comfort and amenities.
  • D. private railway
    A private railway is a rail transport system owned and operated by a non-governmental entity, typically for exclusive use in serving specific industrial, commercial, or regional transportation needs.
  • E. high-speed railway
    A high-speed railway is a rail transport system designed for trains that operate at significantly higher speeds than traditional rail services, typically on specially built or upgraded tracks, to provide fast, efficient, and reliable long-distance passenger travel.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f349a3363081909cea4c9a848cefe2 completed April 30, 2026, 12:22 p.m.
Created at: May 1, 2026, 1:51 a.m.