Triple

T34031743
Position Surface form Disambiguated ID Type / Status
Subject W70 warhead E872672 entity
Predicate instanceOf P0 FINISHED
Object tactical nuclear warhead C4347 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: tactical nuclear warhead
Context triple: [W70 warhead, instanceOf, tactical nuclear warhead]
  • A. strategic nuclear weapon
    A strategic nuclear weapon is a high-yield nuclear device designed for long-range delivery against an adversary’s key military, industrial, or political targets to achieve large-scale, war-altering effects.
  • B. nuclear weapon chosen
    A nuclear weapon is a highly destructive explosive device that releases immense energy through nuclear fission, fusion, or a combination of both, causing catastrophic blast, heat, and radiation effects.
  • C. plutonium implosion-type nuclear bomb
    A plutonium implosion-type nuclear bomb is a weapon that uses precisely timed conventional explosives to symmetrically compress a subcritical plutonium core into a supercritical state, initiating a rapid, uncontrolled nuclear chain reaction.
  • D. strategic nuclear deterrent
    A strategic nuclear deterrent is a nation's capability, typically comprising long-range nuclear weapons and delivery systems, designed to dissuade adversaries from attacking by threatening devastating retaliatory strikes.
  • E. nuclear weapons program
    A nuclear weapons program is an organized, often state-led effort to research, develop, test, produce, and maintain nuclear warheads and their delivery systems for military deterrence or potential use.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f349a2527c81909a7cd4bda94d70ad completed April 30, 2026, 12:22 p.m.
Created at: May 1, 2026, 1:51 a.m.