Triple

T34000260
Position Surface form Disambiguated ID Type / Status
Subject SS Empress of Britain (2029) E871795 entity
Predicate instanceOf P0 FINISHED
Object ocean liner concept C2684 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: ocean liner concept
Context triple: [SS Empress of Britain (2029), instanceOf, ocean liner concept]
  • A. ocean liner chosen
    An ocean liner is a large, robust passenger ship designed for regular long-distance sea voyages, typically across oceans, with an emphasis on speed, safety, and comfort rather than leisure amenities alone.
  • B. cruise ship fleet concept
    A cruise ship fleet concept is a strategic design and operational framework that defines the composition, roles, branding, and deployment of multiple cruise vessels to serve targeted markets and itineraries as a cohesive portfolio.
  • C. Spirit-class ferry
    The Spirit-class ferry is a large, double-ended passenger and vehicle vessel designed for high-capacity, short- to medium-distance coastal and inter-island routes.
  • D. concrete ship
    A concrete ship is a seafaring vessel whose hull is constructed from reinforced concrete instead of traditional materials like steel or wood.
  • E. cruise ship
    A cruise ship is a large passenger vessel designed for leisure voyages, offering accommodations, dining, entertainment, and recreational activities while traveling between destinations.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f3499f8cbc81908de6ec89fa91ea8f completed April 30, 2026, 12:22 p.m.
Created at: May 1, 2026, 1:50 a.m.