Triple
T33985135
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | CST |
E871391
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | space agency facility |
C4504
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: space agency facility Context triple: [CST, instanceOf, space agency facility]
-
A.
space agency
A space agency is an organization, typically government-funded, responsible for planning, developing, and conducting space missions, research, and related technologies.
-
B.
spaceflight center
chosen
A spaceflight center is a facility dedicated to the planning, development, testing, and control of spacecraft and space missions.
-
C.
space-grant institution
A space-grant institution is a college or university designated under the U.S. National Space Grant College and Fellowship Program to promote education, research, and public outreach in space-related fields.
-
D.
space launch facility
A space launch facility is a specialized complex equipped with infrastructure, systems, and support services for preparing, launching, and sometimes recovering spacecraft and launch vehicles.
-
E.
space center building
A space center building is a specialized facility that houses mission control, research laboratories, spacecraft assembly areas, and support infrastructure for planning, monitoring, and managing space missions.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f3499e964c8190b674b03f6f791b4b |
completed | April 30, 2026, 12:22 p.m. |
Created at: May 1, 2026, 1:50 a.m.