Triple

T33963654
Position Surface form Disambiguated ID Type / Status
Subject SS Empress of Britain (2028) E870790 entity
Predicate instanceOf P0 FINISHED
Object ship project C2938 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: ship project
Context triple: [SS Empress of Britain (2028), instanceOf, ship project]
  • A. ship model
    A ship model is a scaled physical or digital representation of a ship, created to depict its structure, design, and features for purposes such as display, study, or simulation.
  • B. shipbuilder
    A shipbuilder is a professional or company that designs, constructs, and repairs ships and other marine vessels, coordinating engineering, materials, and labor to ensure seaworthy and efficient watercraft.
  • C. shipbuilding alliance
    A shipbuilding alliance is a collaborative partnership among shipyards, maritime companies, and related stakeholders formed to jointly design, construct, and support vessels more efficiently and competitively.
  • D. ship sponsor
    A ship sponsor is a person, often a woman of honor, chosen to ceremonially christen and symbolically represent a vessel at its launching.
  • E. infrastructure project chosen
    An infrastructure project is a large-scale, organized effort to plan, design, and construct foundational physical systems—such as transportation, utilities, and public facilities—that support a community’s or region’s economic and social activities.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f3499ce8e88190b66e1d49ad8c7037 completed April 30, 2026, 12:22 p.m.
Created at: May 1, 2026, 1:50 a.m.