Triple
T33963590
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | SS Empress of Canada (1961) |
E870788
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | Carnival Cruise Line ship |
C14792
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: Carnival Cruise Line ship Context triple: [SS Empress of Canada (1961), instanceOf, Carnival Cruise Line ship]
-
A.
cruise ship
chosen
A cruise ship is a large passenger vessel designed for leisure voyages, offering accommodations, dining, entertainment, and recreational activities while traveling between destinations.
-
B.
cruise line
A cruise line is a company that owns, operates, and markets cruise ships, providing passengers with transportation, accommodations, entertainment, and other vacation services at sea and in ports of call.
-
C.
Spirit-class ferry
The Spirit-class ferry is a large, double-ended passenger and vehicle vessel designed for high-capacity, short- to medium-distance coastal and inter-island routes.
-
D.
ocean liner
An ocean liner is a large, robust passenger ship designed for regular long-distance sea voyages, typically across oceans, with an emphasis on speed, safety, and comfort rather than leisure amenities alone.
-
E.
Jumbo Mark II-class ferry
The Jumbo Mark II-class ferry is a large, double-ended passenger and vehicle ferry designed for high-capacity, short-distance routes, featuring multiple vehicle decks and extensive passenger amenities.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f3499ce8e88190b66e1d49ad8c7037 |
completed | April 30, 2026, 12:22 p.m. |
Created at: May 1, 2026, 1:50 a.m.