Triple

T33961176
Position Surface form Disambiguated ID Type / Status
Subject Sham-i Ghazan complex, Tabriz E870718 entity
Predicate startConstructionUnder P9914 FINISHED
Object Ghazan Khan NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Ghazan Khan | Statement: [Sham-i Ghazan complex, Tabriz, startConstructionUnder, Ghazan Khan]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: startConstructionUnder
Context triple: [Sham-i Ghazan complex, Tabriz, startConstructionUnder, Ghazan Khan]
  • A. startConstruction chosen
    Indicates that an entity initiates the process of building or constructing another entity or structure.
  • B. buildingConstructionStart
    Indicates the point in time when the construction work on a building begins.
  • C. mainConstructionPhaseUnder
    Indicates that one construction phase occurs under or is subordinate to another primary construction phase in a project’s timeline or hierarchy.
  • D. factoryConstructionStart
    Indicates the point in time when construction work on a factory begins.
  • E. constructionStartAfter
    Indicates that the start of one construction activity or project occurs after the start of another specified construction activity or project.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f3499ce8e88190b66e1d49ad8c7037 completed April 30, 2026, 12:22 p.m.
NER Named-entity recognition batch_69fff86e544c81908063f61b876c9d78 completed May 10, 2026, 3:15 a.m.
PD Predicate disambiguation batch_69fff7e7cb688190977eeca41aad25b9 completed May 10, 2026, 3:13 a.m.
Created at: May 1, 2026, 1:50 a.m.