Triple

T33943532
Position Surface form Disambiguated ID Type / Status
Subject Indian Point Energy Center E870230 entity
Predicate instanceOf P0 FINISHED
Object nuclear power plant complex C27232 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: nuclear power plant complex
Context triple: [Indian Point Energy Center, instanceOf, nuclear power plant complex]
  • A. nuclear power facility chosen
    A nuclear power facility is an industrial complex that generates electricity by harnessing heat produced from controlled nuclear fission reactions within reactors, converting it into mechanical and then electrical energy.
  • B. nuclear weapons assembly plant
    A nuclear weapons assembly plant is a highly secure industrial facility where nuclear and non-nuclear components are manufactured, integrated, and tested to produce complete nuclear weapons in compliance with strict safety, security, and regulatory standards.
  • C. nuclear weapons component plant
    A nuclear weapons component plant is an industrial facility dedicated to designing, manufacturing, and assembling specialized parts and subsystems used in the construction and maintenance of nuclear weapons.
  • D. uranium processing facility
    A uranium processing facility is an industrial plant where uranium ore is refined, converted, and prepared into nuclear-grade materials for use in fuel production or other nuclear applications.
  • E. nuclear weapons production facility
    A nuclear weapons production facility is a highly secured industrial complex where fissile materials are processed and assembled into components and complete systems for nuclear armaments.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f3499b0dd48190b07b4b60babcee02 completed April 30, 2026, 12:22 p.m.
Created at: May 1, 2026, 1:49 a.m.