Triple
T33943532
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Indian Point Energy Center |
E870230
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | nuclear power plant complex |
C27232
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: nuclear power plant complex Context triple: [Indian Point Energy Center, instanceOf, nuclear power plant complex]
-
A.
nuclear power facility
chosen
A nuclear power facility is an industrial complex that generates electricity by harnessing heat produced from controlled nuclear fission reactions within reactors, converting it into mechanical and then electrical energy.
-
B.
nuclear weapons assembly plant
A nuclear weapons assembly plant is a highly secure industrial facility where nuclear and non-nuclear components are manufactured, integrated, and tested to produce complete nuclear weapons in compliance with strict safety, security, and regulatory standards.
-
C.
nuclear weapons component plant
A nuclear weapons component plant is an industrial facility dedicated to designing, manufacturing, and assembling specialized parts and subsystems used in the construction and maintenance of nuclear weapons.
-
D.
uranium processing facility
A uranium processing facility is an industrial plant where uranium ore is refined, converted, and prepared into nuclear-grade materials for use in fuel production or other nuclear applications.
-
E.
nuclear weapons production facility
A nuclear weapons production facility is a highly secured industrial complex where fissile materials are processed and assembled into components and complete systems for nuclear armaments.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f3499b0dd48190b07b4b60babcee02 |
completed | April 30, 2026, 12:22 p.m. |
Created at: May 1, 2026, 1:49 a.m.