Triple

T33935175
Position Surface form Disambiguated ID Type / Status
Subject Frequencies project E870009 entity
Predicate instanceOf P0 FINISHED
Object global art initiative C28881 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: global art initiative
Context triple: [Frequencies project, instanceOf, global art initiative]
  • A. socially engaged art
    Socially engaged art is a form of artistic practice that prioritizes collaboration, participation, and dialogue with communities to address social, political, or cultural issues.
  • B. arts community
    An arts community is a group of individuals and organizations connected by shared creative practices, resources, and support for producing, presenting, and experiencing the arts.
  • C. visual arts center
    A visual arts center is a dedicated facility that supports the creation, exhibition, education, and appreciation of visual art through studios, galleries, classrooms, and community programs.
  • D. public art space
    A public art space is a shared, accessible environment—physical or virtual—where artworks are displayed or performed for community engagement, cultural expression, and public interaction.
  • E. contemporary art project chosen
    A contemporary art project is a time-bound, concept-driven artistic endeavor that uses current ideas, media, and contexts to explore, question, or reframe cultural, social, or aesthetic issues.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f3499a59788190bff762a891471b31 completed April 30, 2026, 12:22 p.m.
Created at: May 1, 2026, 1:49 a.m.