Triple
T33926451
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Grundsätze der kirchlichen Diakonie |
E869764
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | Leitlinie |
C989
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: Leitlinie Context triple: [Grundsätze der kirchlichen Diakonie, instanceOf, Leitlinie]
-
A.
normative guideline
chosen
A normative guideline is a prescriptive rule or principle that defines how things ought to be done or how people ought to behave within a particular context or system.
-
B.
rule
A rule is a prescribed guideline or principle that defines or constrains behavior, actions, or conditions within a particular system or context.
-
C.
Lineamenta
Lineamenta is a conceptual class representing the fundamental outlines, structural features, and defining contours that shape and organize a system, object, or idea.
-
D.
ICH guideline
An ICH guideline is an internationally harmonized technical standard developed by the International Council for Harmonisation to ensure the quality, safety, and efficacy of pharmaceuticals across different regulatory regions.
-
E.
Instrumentum laboris
Instrumentum laboris is a preparatory working document, often used in ecclesial or organizational contexts, that synthesizes input and outlines key themes to guide discussion and decision-making in a formal assembly or synod.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f349992c508190aa4afa24a086cc8c |
completed | April 30, 2026, 12:22 p.m. |
Created at: May 1, 2026, 1:49 a.m.