Triple

T33924555
Position Surface form Disambiguated ID Type / Status
Subject Bristol Type 200 E869711 entity
Predicate neverBuilt P177912 FINISHED
Object true LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: true | Statement: [Bristol Type 200, neverBuilt, true]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: neverBuilt
Context triple: [Bristol Type 200, neverBuilt, true]
  • A. neverCompletedAs
    Indicates that an entity was at some point expected or intended to have a certain role, status, or outcome, but that role/status/outcome was never actually completed or realized.
  • B. builtWithout
    Indicates that something was constructed or created in the absence of a particular component, material, tool, or condition.
  • C. neverLaunched
    Indicates that an entity (such as a product, project, or mission) was planned or created but was never officially initiated, released, or put into operation.
  • D. notRebuiltAfter
    Indicates that an entity was destroyed or damaged and has not been reconstructed or restored after a specified event or point in time.
  • E. never
    Indicates that the specified relationship or action does not occur at any time or under any circumstances.
  • F. None of above. chosen

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f349992c508190aa4afa24a086cc8c completed April 30, 2026, 12:22 p.m.
NER Named-entity recognition batch_69f7064e906881909c3186c646145d34 completed May 3, 2026, 8:24 a.m.
PD Predicate disambiguation batch_69f70100ec1c8190a6b97f50e88891f2 completed May 3, 2026, 8:02 a.m.
PDg Predicate description generation batch_69f7064d37388190993b2a7305a02b9f completed May 3, 2026, 8:24 a.m.
Created at: May 1, 2026, 1:49 a.m.