Triple

T33887506
Position Surface form Disambiguated ID Type / Status
Subject sacbeob E868668 entity
Predicate instanceOf P0 FINISHED
Object raised stone roads C27626 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: raised stone roads
Context triple: [sacbeob, instanceOf, raised stone roads]
  • A. stone-paved track chosen
    A stone-paved track is a pathway or road surface constructed from closely fitted stones to provide a durable, stable route for travel or transport.
  • B. quern-stones
    Quern-stones are paired, hand-operated stones used since ancient times to grind grains, seeds, or other foodstuffs into flour or meal.
  • C. stone wall
    A stone wall is a constructed barrier made by stacking or binding stones together to enclose, support, or divide areas in a landscape or structure.
  • D. sandstone building
    A sandstone building is a structure constructed primarily from sedimentary sandstone blocks, characterized by its warm, earthy tones and naturally textured stone surfaces.
  • E. ornamental stone
    Ornamental stone is a naturally occurring or engineered rock material selected and crafted for decorative and architectural purposes due to its aesthetic appearance, durability, and finish.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f34996761c8190864e42f7c9cf215b completed April 30, 2026, 12:22 p.m.
Created at: May 1, 2026, 1:48 a.m.