Triple

T33879627
Position Surface form Disambiguated ID Type / Status
Subject Area Control Center E868448 entity
Predicate responsibleForPhaseOfFlight P21768 FINISHED
Object en-route phase LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: en-route phase | Statement: [Area Control Center, responsibleForPhaseOfFlight, en-route phase]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: responsibleForPhaseOfFlight
Context triple: [Area Control Center, responsibleForPhaseOfFlight, en-route phase]
  • A. controlsPhaseOfFlight chosen
    Indicates that one entity has authority over or manages a specific phase of another entity’s flight operation.
  • B. flightPhase
    Indicates the specific stage or phase of an aircraft’s operation within a flight (e.g., taxi, takeoff, climb, cruise, descent, landing).
  • C. aircraftRoleDuringFlight
    Indicates the specific function or role an aircraft fulfills while it is in flight.
  • D. testFlightPhase
    Indicates the specific phase or stage of a test flight that an aircraft or system is currently in.
  • E. phaseOfFlightAtBirdStrike
    Indicates the specific phase of an aircraft’s flight during which a bird strike occurred.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f34995b81c8190acdb45cea5a10eff completed April 30, 2026, 12:22 p.m.
NER Named-entity recognition batch_69f7051ad6e4819095e82bbd64761803 completed May 3, 2026, 8:19 a.m.
PD Predicate disambiguation batch_69f700fe24e08190998e2c96fbaaad38 completed May 3, 2026, 8:02 a.m.
Created at: May 1, 2026, 1:48 a.m.