Triple

T3387520
Position Surface form Disambiguated ID Type / Status
Subject Liberation Tower E71337 entity
Predicate constructionInterrupted P32859 FINISHED
Object 1990 LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 1990 | Statement: [Liberation Tower, constructionInterrupted, 1990]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: constructionInterrupted
Context triple: [Liberation Tower, constructionInterrupted, 1990]
  • A. constructionInterruptedBy
    Indicates that an ongoing construction process is halted, delayed, or disrupted due to the actions or occurrence of another specified entity or event.
  • B. constructionHalted chosen
    Indicates that an ongoing construction activity or project has been stopped or suspended before completion.
  • C. constructionResumed
    Indicates that previously halted construction activity on an entity or project has started again.
  • D. constructionCompleted
    Indicates that a construction process or project has been fully finished and reached its completed state.
  • E. constructionPhase
    Indicates the specific stage or period an entity is in within an overall construction or building process.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ad85a8fd9c819095ecedf838d2bf1b completed March 8, 2026, 2:20 p.m.
NER Named-entity recognition batch_69adb66448fc8190a8582145f02bb1d9 completed March 8, 2026, 5:48 p.m.
PD Predicate disambiguation batch_69ada43615f08190ac2275020d157983 completed March 8, 2026, 4:30 p.m.
Created at: March 8, 2026, 3:14 p.m.