Triple
T33840854
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | CE mark |
E867354
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | conformity marking |
C49702
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: conformity marking Context triple: [CE mark, instanceOf, conformity marking]
-
A.
certification mark
chosen
A certification mark is a symbol, word, or phrase used to indicate that goods or services meet specific standards or qualities set and controlled by an independent certifying organization.
-
B.
conformity assessment scheme
A conformity assessment scheme is a structured, predefined set of rules, procedures, and criteria used to systematically evaluate and determine whether products, services, systems, or persons meet specified standards or regulatory requirements.
-
C.
assay mark
An assay mark is an official stamp or symbol applied to a metal object to certify its composition, purity, and authenticity after testing.
-
D.
conformity assessment board
A conformity assessment board is a governing body that oversees, evaluates, and approves whether products, services, systems, or organizations meet specified standards, regulations, or requirements.
-
E.
utmärkelse
En utmärkelse är en formell erkänsla eller belöning som ges till en person, grupp eller organisation för att uppmärksamma särskilda prestationer, insatser eller meriter.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f34992ad40819087760ed939bd2a7a |
completed | April 30, 2026, 12:22 p.m. |
Created at: May 1, 2026, 1:47 a.m.