Triple
T33839275
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | China Aid Bridge Project in Metro Manila |
E867315
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | bridge construction program |
C61507
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: bridge construction program Context triple: [China Aid Bridge Project in Metro Manila, instanceOf, bridge construction program]
-
A.
bridge builder
A bridge builder is a professional responsible for designing, planning, and constructing bridges that safely span physical obstacles such as rivers, valleys, or roads.
-
B.
bridge replacement project
A bridge replacement project is a coordinated planning, design, and construction effort to remove an existing bridge and build a new structure that meets current safety, capacity, and regulatory standards.
-
C.
bridge construction company
A bridge construction company is a specialized engineering and construction firm that plans, designs, and builds bridges, managing all phases from feasibility studies and structural design to on-site construction and maintenance.
-
D.
bridge structure
A bridge structure is an engineered construction that spans physical obstacles such as water, valleys, or roads to provide a stable pathway for transportation or movement.
-
E.
proposed bridge
A proposed bridge is a planned but not yet constructed structure designed to span a physical obstacle, documented through preliminary designs, locations, and specifications for evaluation and approval.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f34992ad40819087760ed939bd2a7a |
completed | April 30, 2026, 12:22 p.m. |
Created at: May 1, 2026, 1:47 a.m.