Triple

T33839275
Position Surface form Disambiguated ID Type / Status
Subject China Aid Bridge Project in Metro Manila E867315 entity
Predicate instanceOf P0 FINISHED
Object bridge construction program C61507 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: bridge construction program
Context triple: [China Aid Bridge Project in Metro Manila, instanceOf, bridge construction program]
  • A. bridge builder
    A bridge builder is a professional responsible for designing, planning, and constructing bridges that safely span physical obstacles such as rivers, valleys, or roads.
  • B. bridge replacement project
    A bridge replacement project is a coordinated planning, design, and construction effort to remove an existing bridge and build a new structure that meets current safety, capacity, and regulatory standards.
  • C. bridge construction company
    A bridge construction company is a specialized engineering and construction firm that plans, designs, and builds bridges, managing all phases from feasibility studies and structural design to on-site construction and maintenance.
  • D. bridge structure
    A bridge structure is an engineered construction that spans physical obstacles such as water, valleys, or roads to provide a stable pathway for transportation or movement.
  • E. proposed bridge
    A proposed bridge is a planned but not yet constructed structure designed to span a physical obstacle, documented through preliminary designs, locations, and specifications for evaluation and approval.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f34992ad40819087760ed939bd2a7a completed April 30, 2026, 12:22 p.m.
Created at: May 1, 2026, 1:47 a.m.