Triple
T33779805
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Eddystone Generating Station |
E865620
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | fossil-fuel power plant |
C14265
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: fossil-fuel power plant Context triple: [Eddystone Generating Station, instanceOf, fossil-fuel power plant]
-
A.
coal-fired power station
A coal-fired power station is an industrial facility that burns coal to produce steam, which drives turbines connected to generators to produce electricity, while emitting significant air pollutants and greenhouse gases.
-
B.
electric power station
chosen
An electric power station is a facility where various primary energy sources are converted into electrical energy for distribution to homes, businesses, and industries.
-
C.
Fossil fuel
A fossil fuel is a natural energy resource such as coal, oil, or natural gas formed from the decomposed remains of ancient plants and animals over millions of years and burned to release energy.
-
D.
nuclear power facility
A nuclear power facility is an industrial complex that generates electricity by harnessing heat produced from controlled nuclear fission reactions within reactors, converting it into mechanical and then electrical energy.
-
E.
fictional power plant
A fictional power plant is an imagined facility that generates and distributes energy within a narrative world, often using speculative technologies or fantastical resources to power societies, devices, or plot events.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f3498ecc2c8190bcd85e3f11dc215e |
completed | April 30, 2026, 12:22 p.m. |
Created at: May 1, 2026, 1:45 a.m.