Triple
T33777115
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Francilienne (A104/N104) |
E865552
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | planned orbital motorway |
C61122
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: planned orbital motorway Context triple: [Francilienne (A104/N104), instanceOf, planned orbital motorway]
-
A.
orbital highway
An orbital highway is a conceptual network of stable, low-energy transfer paths in space that spacecraft can follow to move efficiently between different orbits or celestial bodies.
-
B.
orbital expressway
An orbital expressway is a high-speed transportation network encircling a planet or celestial body, enabling rapid transit of vehicles, cargo, or passengers along stable orbital paths.
-
C.
space infrastructure project
A space infrastructure project is a large-scale, coordinated initiative to design, build, and operate physical and digital systems that enable sustained activities and services in space, such as communication, transportation, energy, and research.
-
D.
orbital spaceflight
Orbital spaceflight is the process of launching a spacecraft into a stable, continuous orbit around a celestial body, typically Earth, by achieving sufficient horizontal velocity to balance gravitational pull.
-
E.
orbital space station
An orbital space station is a large, habitable artificial structure that continuously orbits a celestial body, serving as a long-term platform for human presence, research, and operations in space.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f3498df6f88190bf9647ea4e4a956e |
completed | April 30, 2026, 12:22 p.m. |
Created at: May 1, 2026, 1:45 a.m.