Triple
T33757720
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | HKIA SkyPier |
E865022
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | airport ferry pier |
C6402
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: airport ferry pier Context triple: [HKIA SkyPier, instanceOf, airport ferry pier]
-
A.
ferry terminal
chosen
A ferry terminal is a designated facility where passengers and vehicles embark and disembark from ferries, typically providing ticketing, waiting areas, and docking infrastructure.
-
B.
river pier
A river pier is a fixed or floating structure extending from the riverbank into the water, used for mooring boats, loading and unloading goods or passengers, and providing access to the river.
-
C.
port authority
A port authority is an organization responsible for managing, regulating, and developing a seaport or group of ports, including their infrastructure, operations, and related maritime activities.
-
D.
port area
A port area is a designated coastal or riverside zone equipped with infrastructure and facilities for the berthing, loading, unloading, storage, and transfer of cargo and passengers between land and water transport.
-
E.
airport parking
Airport parking is a designated area or facility where travelers temporarily leave their vehicles while they use air transportation services.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f3498d3b748190aa3c4006c1f32f38 |
completed | April 30, 2026, 12:22 p.m. |
Created at: May 1, 2026, 1:45 a.m.