Triple
T33697507
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Iridium OpenPort |
E863355
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | Iridium service |
C27745
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: Iridium service Context triple: [Iridium OpenPort, instanceOf, Iridium service]
-
A.
mobile satellite service system
chosen
A mobile satellite service system is a communication network that uses satellites to provide voice, data, and messaging connectivity to mobile users over wide geographic areas, including remote and underserved regions.
-
B.
telephony service
A telephony service is a system that enables the transmission, routing, and management of voice and related communication over telephone networks or IP-based infrastructures.
-
C.
wire service
A wire service is a news agency that gathers, writes, and distributes news stories and information to subscribing media outlets, such as newspapers, broadcasters, and online platforms, often in real time.
-
D.
service hut
A service hut is a small, often temporary or semi-permanent structure that provides essential utilities, maintenance functions, or support services for nearby facilities or infrastructure.
-
E.
GNSS service organization
An organization that plans, operates, maintains, and manages Global Navigation Satellite System (GNSS) infrastructure and services to provide reliable positioning, navigation, and timing information to users.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f3498723a08190ac034339cc78eade |
completed | April 30, 2026, 12:22 p.m. |
Created at: May 1, 2026, 1:43 a.m.