Triple

T33697505
Position Surface form Disambiguated ID Type / Status
Subject Iridium OpenPort E863355 entity
Predicate instanceOf P0 FINISHED
Object satellite communication service C27745 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: satellite communication service
Context triple: [Iridium OpenPort, instanceOf, satellite communication service]
  • A. geostationary communications satellite
    A geostationary communications satellite is a spacecraft positioned in an equatorial orbit that matches Earth's rotation, remaining fixed over one longitude to relay telecommunications signals between ground stations.
  • B. mobile satellite service system chosen
    A mobile satellite service system is a communication network that uses satellites to provide voice, data, and messaging connectivity to mobile users over wide geographic areas, including remote and underserved regions.
  • C. space communication network
    A space communication network is an interconnected system of ground stations, satellites, and relay nodes that enables the reliable transmission, routing, and reception of data across space and between space-based and terrestrial assets.
  • D. satellite system
    A satellite system is an integrated network of orbiting spacecraft, ground stations, and communication links designed to perform functions such as communication, navigation, Earth observation, or scientific research.
  • E. satellite operator
    A satellite operator is an entity responsible for controlling, monitoring, and managing satellites and their payloads to deliver space-based services such as communications, navigation, or Earth observation.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f3498723a08190ac034339cc78eade completed April 30, 2026, 12:22 p.m.
Created at: May 1, 2026, 1:43 a.m.