Triple

T33689357
Position Surface form Disambiguated ID Type / Status
Subject طريق 25 E863131 entity
Predicate instanceOf P0 FINISHED
Object بنية تحتية للنقل البري C2978 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: بنية تحتية للنقل البري
Context triple: [طريق 25, instanceOf, بنية تحتية للنقل البري]
  • A. road infrastructure chosen
    Road infrastructure encompasses the physical structures, systems, and facilities—such as roads, bridges, tunnels, signage, and drainage—designed and built to support safe and efficient vehicular and pedestrian transportation.
  • B. transport infrastructure network
    A transport infrastructure network is an interconnected system of physical routes and facilities—such as roads, railways, ports, and airports—designed to enable the efficient movement of people and goods across regions.
  • C. entidad de infraestructura vial
    Entidad de infraestructura vial es una organización pública o privada responsable de la planificación, construcción, operación, mantenimiento y gestión de las redes y servicios de transporte terrestre, como carreteras, puentes y túneles.
  • D. rail transportation infrastructure
    Rail transportation infrastructure encompasses the physical and organizational systems—such as tracks, stations, signaling, power supply, and related facilities—required to support the safe and efficient movement of trains and rail-based services.
  • E. public transportation infrastructure
    Public transportation infrastructure encompasses the physical and organizational systems—such as buses, trains, stations, tracks, and supporting facilities—that enable the efficient movement of people via shared transit services.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f3498662b48190904442c39df84fb7 completed April 30, 2026, 12:22 p.m.
Created at: May 1, 2026, 1:43 a.m.