Triple
T33669032
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Outram, Singapore |
E862566
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | Planning Area of Singapore |
C47789
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: Planning Area of Singapore Context triple: [Outram, Singapore, instanceOf, Planning Area of Singapore]
-
A.
Planning area of Singapore
chosen
A planning area of Singapore is an officially designated geographic subdivision used for urban planning, administration, and statistical purposes within the country.
-
B.
Town in Singapore
A Town in Singapore is a planned urban area comprising residential neighborhoods, commercial centers, and community facilities, administered by a town council and designed to provide a self-contained living environment for its residents.
-
C.
street in Singapore
A street in Singapore is a public urban thoroughfare that supports vehicular and pedestrian movement while reflecting the city-state’s dense, tropical, and multicultural environment through its infrastructure, landscaping, and surrounding architecture.
-
D.
China–Singapore cooperative project
A China–Singapore cooperative project is a jointly planned and implemented initiative between Chinese and Singaporean entities aimed at promoting mutual economic, technological, cultural, or infrastructural development.
-
E.
Act of Parliament of Singapore
An Act of Parliament of Singapore is a written law formally enacted by the Singapore Parliament, receiving Presidential assent and forming part of the nation’s primary legislation.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f34984c4008190bb82f33a7819da64 |
completed | April 30, 2026, 12:22 p.m. |
Created at: May 1, 2026, 1:42 a.m.