Triple

T33667808
Position Surface form Disambiguated ID Type / Status
Subject Trustees’ Office E862537 entity
Predicate instanceOf P0 FINISHED
Object Shaker building C42006 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Shaker building
Context triple: [Trustees’ Office, instanceOf, Shaker building]
  • A. Shaker
    A Shaker is a container or device designed to mix or agitate its contents, typically by shaking, to combine ingredients or produce a desired consistency.
  • B. Shaker village chosen
    A Shaker village is a self-sufficient communal settlement established by the Shakers, featuring simple, functional architecture, shared resources, and spaces organized around their religious, social, and economic practices.
  • C. Moravian dwelling
    A Moravian dwelling is a traditional residential structure associated with the Moravian Church communities, typically characterized by simple, functional design, communal orientation, and modest decorative elements reflecting Central European influences.
  • D. Case Study House
    A Case Study House is a modernist residential prototype designed, often in mid-20th-century California, to experimentally explore innovative, affordable, and efficient postwar housing solutions.
  • E. frontier-era building
    A frontier-era building is a simple, utilitarian structure made from locally available materials, designed to provide basic shelter and function in remote, newly settled regions.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f34984c4008190bb82f33a7819da64 completed April 30, 2026, 12:22 p.m.
Created at: May 1, 2026, 1:42 a.m.