Triple

T33666508
Position Surface form Disambiguated ID Type / Status
Subject Geschützwagen Tiger (Grille 17/21) E862507 entity
Predicate instanceOf P0 FINISHED
Object German self-propelled artillery vehicle project C29127 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: German self-propelled artillery vehicle project
Context triple: [Geschützwagen Tiger (Grille 17/21), instanceOf, German self-propelled artillery vehicle project]
  • A. Karl-Gerät
    Karl-Gerät was a series of German World War II self-propelled siege mortars, among the largest artillery pieces ever built, designed to fire massive shells against heavily fortified targets.
  • B. self-propelled howitzer variant
    A self-propelled howitzer variant is an armored, mobile artillery platform built on a powered chassis that modifies a base howitzer design for specific roles such as increased firepower, protection, mobility, or specialized mission capabilities.
  • C. World War II armoured fighting vehicle chosen
    A World War II armoured fighting vehicle is a tracked or wheeled, armored, and typically armed military vehicle designed and used between 1939 and 1945 for frontline combat, support, or reconnaissance roles.
  • D. armored vehicle development program
    A coordinated, multi-phase initiative that manages the research, design, testing, production, and fielding of new or upgraded armored combat vehicles to meet defined military requirements.
  • E. German military equipment
    German military equipment encompasses the weapons, vehicles, gear, and support systems designed, produced, or used by German armed forces across different historical periods.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f34984c4008190bb82f33a7819da64 completed April 30, 2026, 12:22 p.m.
Created at: May 1, 2026, 1:42 a.m.