Triple

T33665941
Position Surface form Disambiguated ID Type / Status
Subject Portal North Bridge project E862491 entity
Predicate instanceOf P0 FINISHED
Object bridge replacement project C61460 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: bridge replacement project
Context triple: [Portal North Bridge project, instanceOf, bridge replacement project]
  • A. bridge structure
    A bridge structure is an engineered construction that spans physical obstacles such as water, valleys, or roads to provide a stable pathway for transportation or movement.
  • B. river bridge
    A river bridge is a structure built to span a river, providing a stable pathway for vehicles, pedestrians, or rail traffic to cross from one bank to the other.
  • C. reconstructed bridge
    A reconstructed bridge is a previously existing bridge that has been rebuilt or extensively restored, often using a combination of original and new materials, to regain or improve its structural integrity and functionality.
  • D. proposed bridge
    A proposed bridge is a planned but not yet constructed structure designed to span a physical obstacle, documented through preliminary designs, locations, and specifications for evaluation and approval.
  • E. bridge operator
    A bridge operator is an entity responsible for managing and controlling the operation, safety, and coordination of a bridge’s movable or functional components to ensure efficient and secure passage for users.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f34984c4008190bb82f33a7819da64 completed April 30, 2026, 12:22 p.m.
Created at: May 1, 2026, 1:42 a.m.