Triple
T33653992
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | MONIAC hydraulic computer |
E862172
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | hydraulic computer |
C12
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: hydraulic computer Context triple: [MONIAC hydraulic computer, instanceOf, hydraulic computer]
-
A.
mechanical computer
A mechanical computer is a device that performs calculations or processes information using purely mechanical components such as gears, levers, and cams instead of electronic circuits.
-
B.
electromechanical computer
An electromechanical computer is a computing device that performs calculations using a combination of electrical circuits and mechanically moving components such as relays, switches, or rotating shafts.
-
C.
analog computer
chosen
An analog computer is a computing device that represents and processes data as continuously variable physical quantities, such as voltages or mechanical motions, to model and solve mathematical problems.
-
D.
hydraulic parameter
A hydraulic parameter is a quantitative property (such as conductivity, transmissivity, or storativity) that characterizes how fluids move through and are stored within a porous or fractured medium.
-
E.
S-100 bus computer
An S-100 bus computer is a microcomputer system built around the S-100 expansion bus standard, using a backplane and plug-in cards for CPU, memory, and I/O to create a modular, expandable architecture.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f349840ba881908e3bfce536aeb92b |
completed | April 30, 2026, 12:22 p.m. |
Created at: May 1, 2026, 1:42 a.m.