Triple
T33643808
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Soil Health Card Scheme |
E861901
|
entity |
| Predicate | phase2Period |
P177638
|
FINISHED |
| Object | 2017-2019 |
—
|
LITERAL FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 2017-2019 | Statement: [Soil Health Card Scheme, phase2Period, 2017-2019]
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: phase2Period Context triple: [Soil Health Card Scheme, phase2Period, 2017-2019]
-
A.
phase2Terminus
Indicates that an entity serves as the endpoint or final state of a second phase in a multi-phase process or sequence.
-
B.
secondPhaseEndTime
Indicates the time at which the second phase of a process or event concludes.
-
C.
phase2Purpose
Indicates the specific intended goal, function, or outcome associated with the second phase of a process or project.
-
D.
phase2Opening
Indicates the initiation or start of a second phase or stage in a process, sequence, or operation.
-
E.
secondPhaseStartDate
Indicates the date on which the second phase of a process, project, or activity begins.
- F. None of above. chosen
Provenance (4 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f3498280c48190bcc3494017d14234 |
completed | April 30, 2026, 12:22 p.m. |
| NER | Named-entity recognition | batch_69f7009d39508190af7301f824615e88 |
completed | May 3, 2026, 8 a.m. |
| PD | Predicate disambiguation | batch_69f6fc5740fc81909774a4f65201a3ff |
completed | May 3, 2026, 7:42 a.m. |
| PDg | Predicate description generation | batch_69f6ffb7554881908993d6d2ffbcf8f5 |
completed | May 3, 2026, 7:56 a.m. |
Created at: May 1, 2026, 1:42 a.m.