Triple

T3362906
Position Surface form Disambiguated ID Type / Status
Subject Blackfriars Bridge E70764 entity
Predicate architect P184 FINISHED
Object Joseph Cubitt E158401 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Joseph Cubitt | Statement: [Blackfriars Bridge, architect, Joseph Cubitt]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Joseph Cubitt
Context triple: [Blackfriars Bridge, architect, Joseph Cubitt]
  • A. Fred Niblo
    Fred Niblo was an American film director and actor best known for his work during the silent era, including classics like "Ben-Hur: A Tale of the Christ" (1925).
  • B. William Jessop
    William Jessop was a prominent 18th-century English civil engineer known for his influential work on canals, docks, and early railways during the Industrial Revolution.
  • C. Thomas Fairbairn
    Thomas Fairbairn was a prominent 19th-century British industrialist and art patron known for his leading role in organizing major art exhibitions in Manchester.
  • D. Lewis Cubitt chosen
    Lewis Cubitt was a 19th-century English architect best known for designing major London railway termini and related infrastructure.
  • E. Sir William Cubitt
    Sir William Cubitt was a prominent 19th-century English civil engineer known for major infrastructure projects, including canals, railways, and the design of the London & Blackwall Railway.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ad85a660c48190998489309a3b4869 completed March 8, 2026, 2:20 p.m.
NER Named-entity recognition batch_69adb26a5a508190948932769de0dbb3 completed March 8, 2026, 5:31 p.m.
NED1 Entity disambiguation (via context triple) batch_69b32549eb9c81908c3a525da9eab0aa completed March 12, 2026, 8:42 p.m.
Created at: March 8, 2026, 3:13 p.m.