Triple
T33617176
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Labuan jetty |
E861149
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | coastal pier |
C60644
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: coastal pier Context triple: [Labuan jetty, instanceOf, coastal pier]
-
A.
waterfront pier complex
A waterfront pier complex is a multi-use structure extending over the water that integrates docking facilities, public promenades, and commercial or recreational amenities along the shoreline.
-
B.
fishing pier
A fishing pier is a raised structure extending from the shore over the water, designed to provide anglers with safe, convenient access to deeper fishing areas without using a boat.
-
C.
river pier
A river pier is a fixed or floating structure extending from the riverbank into the water, used for mooring boats, loading and unloading goods or passengers, and providing access to the river.
-
D.
oceanographic research pier
An oceanographic research pier is a specialized coastal structure extending into the sea, equipped with instruments and facilities that allow scientists to conduct long-term, in situ studies of marine and atmospheric processes.
-
E.
seawall
A seawall is a coastal defense structure built parallel to the shoreline to protect land and infrastructure from wave action, erosion, and storm surges.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f34980fabc81909819228729a9ca84 |
completed | April 30, 2026, 12:22 p.m. |
Created at: May 1, 2026, 1:41 a.m.