Triple

T33617176
Position Surface form Disambiguated ID Type / Status
Subject Labuan jetty E861149 entity
Predicate instanceOf P0 FINISHED
Object coastal pier C60644 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: coastal pier
Context triple: [Labuan jetty, instanceOf, coastal pier]
  • A. waterfront pier complex
    A waterfront pier complex is a multi-use structure extending over the water that integrates docking facilities, public promenades, and commercial or recreational amenities along the shoreline.
  • B. fishing pier
    A fishing pier is a raised structure extending from the shore over the water, designed to provide anglers with safe, convenient access to deeper fishing areas without using a boat.
  • C. river pier
    A river pier is a fixed or floating structure extending from the riverbank into the water, used for mooring boats, loading and unloading goods or passengers, and providing access to the river.
  • D. oceanographic research pier
    An oceanographic research pier is a specialized coastal structure extending into the sea, equipped with instruments and facilities that allow scientists to conduct long-term, in situ studies of marine and atmospheric processes.
  • E. seawall
    A seawall is a coastal defense structure built parallel to the shoreline to protect land and infrastructure from wave action, erosion, and storm surges.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f34980fabc81909819228729a9ca84 completed April 30, 2026, 12:22 p.m.
Created at: May 1, 2026, 1:41 a.m.