Triple

T33584354
Position Surface form Disambiguated ID Type / Status
Subject Noorderzijlvest E860239 entity
Predicate instanceOf P0 FINISHED
Object waterschap C48930 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: waterschap
Context triple: [Noorderzijlvest, instanceOf, waterschap]
  • A. Dutch water board chosen
    A Dutch water board is a regional government body responsible for managing water levels, flood protection, water quality, and wastewater treatment within its designated area in the Netherlands.
  • B. watershed
    A watershed is a land area that channels rainfall and snowmelt into streams and rivers, ultimately draining into a common outlet such as a larger river, lake, or ocean.
  • C. river in the Netherlands
    A river in the Netherlands is a natural flowing watercourse within Dutch territory that shapes the lowland landscape, supports ecosystems, and serves as a vital route for transport, water management, and economic activity.
  • D. waterway management organization
    A waterway management organization is an entity responsible for planning, regulating, maintaining, and improving rivers, canals, and related water infrastructure to ensure safe navigation, environmental protection, and sustainable water use.
  • E. watershed district
    A watershed district is a geographically defined area governed by an organization responsible for managing water resources, drainage, and related environmental concerns within a specific river or drainage basin.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f3497e70e48190951c94d072879bec completed April 30, 2026, 12:22 p.m.
Created at: May 1, 2026, 1:40 a.m.