Triple
T33581537
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Business routes of U.S. Route 19 |
E860161
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | highway system element |
C3122
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: highway system element Context triple: [Business routes of U.S. Route 19, instanceOf, highway system element]
-
A.
highway system
A highway system is an interconnected network of major roads and supporting infrastructure designed to enable efficient, high-capacity vehicular travel between cities and regions.
-
B.
interstate highway system component
An interstate highway system component is any physical or functional element—such as roadways, interchanges, signage, or support infrastructure—that collectively enables the operation, connectivity, and safety of the national interstate highway network.
-
C.
highway segment
A highway segment is a continuous portion of a highway between two defined endpoints, such as interchanges, intersections, or mile markers, characterized by consistent physical and operational attributes.
-
D.
highway
chosen
A highway is a major public road designed for high-speed, long-distance vehicular travel, typically featuring multiple lanes, limited access points, and safety infrastructure.
-
E.
elevated expressway
An elevated expressway is a high-capacity roadway built on raised structures above ground level to allow uninterrupted traffic flow over urban streets, railways, or other obstacles.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f3497d37848190afcbb5ef3f5c7376 |
completed | April 30, 2026, 12:22 p.m. |
Created at: May 1, 2026, 1:40 a.m.