Triple

T33555252
Position Surface form Disambiguated ID Type / Status
Subject A4 motorway access (Desenzano del Garda) E859453 entity
Predicate instanceOf P0 FINISHED
Object road access infrastructure C33732 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: road access infrastructure
Context triple: [A4 motorway access (Desenzano del Garda), instanceOf, road access infrastructure]
  • A. road infrastructure
    Road infrastructure encompasses the physical structures, systems, and facilities—such as roads, bridges, tunnels, signage, and drainage—designed and built to support safe and efficient vehicular and pedestrian transportation.
  • B. road network
    A road network is an interconnected system of roads, intersections, and related infrastructure that enables the movement of vehicles and pedestrians between different locations.
  • C. controlled-access highway
    A controlled-access highway is a high-speed road designed for uninterrupted traffic flow, featuring limited entry and exit points via ramps, no at-grade intersections, and restrictions on pedestrian and non-motorized access.
  • D. entidad de infraestructura vial
    Entidad de infraestructura vial es una organización pública o privada responsable de la planificación, construcción, operación, mantenimiento y gestión de las redes y servicios de transporte terrestre, como carreteras, puentes y túneles.
  • E. roadway approach chosen
    A roadway approach is the segment of a road leading up to an intersection, junction, or control device, where vehicles transition from through movement to potential stopping, turning, or yielding maneuvers.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f3497b2b68819093207971b5e13dc8 completed April 30, 2026, 12:22 p.m.
Created at: May 1, 2026, 1:40 a.m.