Triple

T33467150
Position Surface form Disambiguated ID Type / Status
Subject Sebkay E857084 entity
Predicate statusOfAttestation P190791 FINISHED
Object poorly attested LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: poorly attested | Statement: [Sebkay, statusOfAttestation, poorly attested]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: statusOfAttestation
Context triple: [Sebkay, statusOfAttestation, poorly attested]
  • A. hasAttestationStatus chosen
    Indicates the current verification or approval state that has been assigned to something, such as whether it has been formally attested, validated, or certified.
  • B. hasAttestation
    Indicates that there exists a formal confirmation, evidence, or certification supporting the validity or authenticity of something.
  • C. attestation
    Indicates a formal declaration or confirmation that something is true, accurate, or has been verified.
  • D. certificateStatus
    Indicates the current validity or state (e.g., valid, expired, revoked) of a certificate within a given system or context.
  • E. timeOfAttestation
    Indicates the specific time at which a statement, document, or claim is formally attested or verified.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f34973461481909c701c98ebd75623 completed April 30, 2026, 12:22 p.m.
NER Named-entity recognition batch_69ff069ec1348190815375c5c9e38404 completed May 9, 2026, 10:04 a.m.
PD Predicate disambiguation batch_69ff05ba57f88190a45d20f18044e0fb completed May 9, 2026, 10 a.m.
Created at: May 1, 2026, 1:37 a.m.