Triple
T33450521
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | U.S. Soccer Youth Technical Director |
E856625
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | technical director position |
C20922
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: technical director position Context triple: [U.S. Soccer Youth Technical Director, instanceOf, technical director position]
-
A.
technical role
chosen
A technical role is a position focused on applying specialized scientific, engineering, or technological expertise to design, build, maintain, or improve systems, products, or processes.
-
B.
technical personnel
Technical personnel are individuals with specialized knowledge and skills who install, operate, maintain, or support technical systems, equipment, or processes within an organization.
-
C.
technical expert
A technical expert is a highly skilled individual with deep, specialized knowledge in a particular technical domain who can analyze complex problems and provide effective, evidence-based solutions.
-
D.
technical management board
A technical management board is a governing body of senior experts responsible for overseeing, guiding, and making strategic decisions about an organization’s technical direction, standards, and priorities.
-
E.
Technical Secretariat
The Technical Secretariat is an organizational unit responsible for providing specialized technical, administrative, and coordination support to ensure the effective implementation, monitoring, and documentation of an institution’s policies, programs, and decision-making processes.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f3497281a08190b4705de0b5f26ba7 |
completed | April 30, 2026, 12:22 p.m. |
Created at: May 1, 2026, 1:37 a.m.