Triple

T33446056
Position Surface form Disambiguated ID Type / Status
Subject The Pink Panther 3 (planned film) E856505 entity
Predicate plannedReleasePeriod P173218 FINISHED
Object 2010s LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 2010s | Statement: [The Pink Panther 3 (planned film), plannedReleasePeriod, 2010s]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: plannedReleasePeriod
Context triple: [The Pink Panther 3 (planned film), plannedReleasePeriod, 2010s]
  • A. intendedForReleaseIn chosen
    Indicates that something is planned or scheduled to be made available or launched within a specified context, such as a time, market, or platform.
  • B. stableReleaseApproxDate
    Indicates an approximate calendar date when a stable release of something is (or was) expected to become available.
  • C. previewReleaseDate
    Indicates the date on which a preview or pre-release version of something is or was made available.
  • D. originallyScheduledReleaseDate
    Indicates the date on which something was first planned or intended to be released, before any later changes or rescheduling.
  • E. plannedAt
    Indicates that an event, action, or activity is scheduled or intended to occur at a specific time or date.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f34971b75881908be360bb041f003c completed April 30, 2026, 12:22 p.m.
NER Named-entity recognition batch_69fb6fdc7eb081908ab8475efb38c430 completed May 6, 2026, 4:44 p.m.
PD Predicate disambiguation batch_69fb5a986e588190b7a10892bd2ff44c completed May 6, 2026, 3:13 p.m.
Created at: May 1, 2026, 1:37 a.m.