Triple

T33388630
Position Surface form Disambiguated ID Type / Status
Subject Ofatumumab E854986 entity
Predicate FDAMSApprovalYear P24562 FINISHED
Object 2020 LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 2020 | Statement: [Ofatumumab, FDAMSApprovalYear, 2020]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: FDAMSApprovalYear
Context triple: [Ofatumumab, FDAMSApprovalYear, 2020]
  • A. yearApproved
    Indicates the specific year in which something (such as a proposal, product, or decision) was formally approved.
  • B. regulatoryApprovalYear chosen
    Indicates the calendar year in which an official regulatory body granted approval for the referenced item, action, or entity.
  • C. authorizationYear
    Indicates the year in which an official approval, permission, or authorization for something was granted.
  • D. nameApprovedYear
    Indicates the year in which a particular name was formally approved or authorized.
  • E. finalReportSubmissionYear
    Indicates the calendar year in which the final report is formally submitted.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f3496d54048190a1cb91fdd7caa6ea completed April 30, 2026, 12:22 p.m.
NER Named-entity recognition batch_69f6f38159d08190980ad639e08f00f4 completed May 3, 2026, 7:04 a.m.
PD Predicate disambiguation batch_69f6e3d7bee48190b94e0beb48a1d7fa completed May 3, 2026, 5:57 a.m.
Created at: May 1, 2026, 1:35 a.m.