Triple

T33372946
Position Surface form Disambiguated ID Type / Status
Subject Arun III Hydroelectric Project E854546 entity
Predicate afterConcessionTransferTo P180181 FINISHED
Object Government of Nepal NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Government of Nepal | Statement: [Arun III Hydroelectric Project, afterConcessionTransferTo, Government of Nepal]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: afterConcessionTransferTo
Context triple: [Arun III Hydroelectric Project, afterConcessionTransferTo, Government of Nepal]
  • A. transferAfter
    Indicates that one entity transfers something to another entity only after a specified event or condition has occurred.
  • B. afterAcquisitionBy
    Indicates that something occurs or holds true following the acquisition of one entity by another.
  • C. negotiatedAfter
    Indicates that one negotiation event occurred later in time than another referenced event or negotiation.
  • D. concessionBy
    Indicates that one party grants, yields, or makes allowances to another, often accepting a demand, point, or condition despite initial opposition or differing interests.
  • E. finalCessionBy
    Indicates that one party makes the last or conclusive transfer or assignment of rights, claims, or property to another party.
  • F. None of above. chosen

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f3496ca10c8190908640d18fa00832 completed April 30, 2026, 12:22 p.m.
NER Named-entity recognition batch_69f73223675481908c1bc3208c0f5284 completed May 3, 2026, 11:31 a.m.
PD Predicate disambiguation batch_69f7317690108190b3aae2cd2e1d069e completed May 3, 2026, 11:28 a.m.
PDg Predicate description generation batch_69f73221eef88190bd8905e6e9f5a586 completed May 3, 2026, 11:31 a.m.
Created at: May 1, 2026, 1:35 a.m.