Triple
T33372918
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Arun III Hydroelectric Project |
E854546
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | run-of-the-river hydropower project |
C12222
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: run-of-the-river hydropower project Context triple: [Arun III Hydroelectric Project, instanceOf, run-of-the-river hydropower project]
-
A.
run-of-the-river hydroelectric power plant
chosen
A run-of-the-river hydroelectric power plant is a facility that generates electricity by using the natural flow and elevation drop of a river with minimal water storage, diverting part of the river through turbines before returning it downstream.
-
B.
planned hydroelectric power station
A planned hydroelectric power station is a proposed facility designed to generate electricity by harnessing the potential and kinetic energy of water, currently in the stages of planning, approval, or early development rather than operation.
-
C.
hydroelectric power complex
A hydroelectric power complex is an integrated facility that harnesses the energy of flowing or falling water—using dams, reservoirs, turbines, and generators—to produce and distribute electrical power.
-
D.
hydroelectric dam
A hydroelectric dam is a large engineered structure that stores and controls river water to drive turbines and generate electricity while managing water flow and levels.
-
E.
hydroelectric power river
A hydroelectric power river is a watercourse whose flowing or falling water is harnessed through engineered structures like dams and turbines to generate electricity.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f3496ca10c8190908640d18fa00832 |
completed | April 30, 2026, 12:22 p.m. |
Created at: May 1, 2026, 1:35 a.m.