Triple

T33372918
Position Surface form Disambiguated ID Type / Status
Subject Arun III Hydroelectric Project E854546 entity
Predicate instanceOf P0 FINISHED
Object run-of-the-river hydropower project C12222 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: run-of-the-river hydropower project
Context triple: [Arun III Hydroelectric Project, instanceOf, run-of-the-river hydropower project]
  • A. run-of-the-river hydroelectric power plant chosen
    A run-of-the-river hydroelectric power plant is a facility that generates electricity by using the natural flow and elevation drop of a river with minimal water storage, diverting part of the river through turbines before returning it downstream.
  • B. planned hydroelectric power station
    A planned hydroelectric power station is a proposed facility designed to generate electricity by harnessing the potential and kinetic energy of water, currently in the stages of planning, approval, or early development rather than operation.
  • C. hydroelectric power complex
    A hydroelectric power complex is an integrated facility that harnesses the energy of flowing or falling water—using dams, reservoirs, turbines, and generators—to produce and distribute electrical power.
  • D. hydroelectric dam
    A hydroelectric dam is a large engineered structure that stores and controls river water to drive turbines and generate electricity while managing water flow and levels.
  • E. hydroelectric power river
    A hydroelectric power river is a watercourse whose flowing or falling water is harnessed through engineered structures like dams and turbines to generate electricity.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f3496ca10c8190908640d18fa00832 completed April 30, 2026, 12:22 p.m.
Created at: May 1, 2026, 1:35 a.m.