Triple

T33353878
Position Surface form Disambiguated ID Type / Status
Subject Westcombe Park railway station E854016 entity
Predicate hasLondonFareIntegration P177118 FINISHED
Object yes LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: yes | Statement: [Westcombe Park railway station, hasLondonFareIntegration, yes]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: hasLondonFareIntegration
Context triple: [Westcombe Park railway station, hasLondonFareIntegration, yes]
  • A. hasFareIntegration chosen
    Indicates that two or more transportation services or systems share a coordinated fare structure, allowing passengers to use a single ticket or payment arrangement across them.
  • B. isWithinLondonFareSystem
    Indicates that an entity (such as a station, stop, or route) is located inside the area covered by the London public transport fare system.
  • C. hasFareControlIntegrationSince
    Indicates that a fare control system has been integrated with another system or entity starting from a specific point in time.
  • D. hasFareZoneSystem
    Indicates that an entity uses or is associated with a particular fare zone system for determining travel costs or ticketing.
  • E. hasLondonOvergroundPlatforms
    Indicates that the subject has platforms specifically served by the London Overground rail network.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f3496acbc8819099fd0305ecc42080 completed April 30, 2026, 12:22 p.m.
NER Named-entity recognition batch_69fe766490c081908c49c8cc07d0ae9b completed May 8, 2026, 11:48 p.m.
PD Predicate disambiguation batch_69fe75bb5f4481908572a5ffcbdc5154 completed May 8, 2026, 11:46 p.m.
Created at: May 1, 2026, 1:34 a.m.